Close

Flow’s Comments on Responses to the OUR Consultation Document on Cost Model for the Assessment of Fixed Infrastructure Sharing Rates – Draft Model (Document No: 2021/TEL/001/CON.001)

  • Home
  •  / 
  • Consultation Responses
  •  / 
  • Flow’s Comments on Responses to the OUR Consultation Document on Cost Model for the Assessment of Fixed Infrastructure Sharing Rates – Draft Model (Document No: 2021/TEL/001/CON.001)

Flow’s Comments on Responses to the OUR Consultation Document on Cost Model for the Assessment of Fixed Infrastructure Sharing Rates – Draft Model (Document No: 2021/TEL/001/CON.001)

INTRODUCTION

  1. This response is submitted on behalf of Cable & Wireless Jamaica Limited and Columbus Communications Jamaica Limited (jointly hereinafter referred to as “Flow”). Flow welcomes the opportunity to respond to comments to the Office of Utilities Regulation’s (“OUR”) Consultation Document, Cost Model for the Assessment of Fixed Infrastructure Sharing Rates—Draft Model, dated 18 January 2021.
  2. We understand that, besides Flow, Digicel submitted comments to the Consultation Document. C&WJ is not responding to each statement by Digicel; however, our choice not to address any statement does not represent our agreement

READ MORE